Design & Build Projects

Goodwill, Taylor Pointe Centre. Louisville, KY.

This Goodwill building located at 4109 Taylorsville Road in Louisville, has become the top revenue producer in Kentucky. The brick and block one story building includes offices, bathrooms, extensive merchandise display areas and and a covered car and truck drop-off canopy.

Goodwill, Louisville KY
Goodwill, Louisville KY
Goodwill, Louisville KY
Goodwill, Louisville KY
Goodwill, Louisville KY
Goodwill, Louisville KY
Goodwill, Louisville KY
Value:
$1,500,000
Size:
15,000 sq. ft.
Architect:
Bayus Design
Completion:
February 2010

St. Michael Orthodox Church. Louisville, KY.

This educational building includes classrooms for pre-schoolers through teenagers. The building includes a choir room and a drive-up entry canopy at the front of the church. Elder Construction also built new street signage for the parish.

St. Michael
Value:
$1,200,000
Size:
5,000 sq. ft.
Architect:
Studio Kremer
Completion:
June 2005
St. Michael
St. Michael
St. Michael
St. Michael

St. Paisius Orthodox Monastery. Safford, AZ.

Elder Construction completed the construction of the monastery' Church of the Holy Virgin in February 2010. The monastery is located in a remote area of Arizona's Sonoran desert. The firm resolved major structural issue to raise the domes into place, framed the complex interior, installed windows and doors, installed decorative flooring and supervised the installation of the electrical, plumbing and HVAC systems as well as the interior plaster and exterior stucco work.

St. Paisius Orthodox Monastery
St. Paisius Orthodox Monastery
St. Paisius Orthodox Monastery
St. Paisius Orthodox Monastery
St. Paisius Orthodox Monastery
St. Paisius Orthodox Monastery
St. Paisius Orthodox Monastery
Value:
$2,500,000
Size:
5,000 sq. ft.
Architect:
John E. Brown
Completion:
February 2010

Burlington Coat FactoryGoodwill

SearsWalmart

KmartKrogerStarbucks

Sprint TelecommunicationsMacys

Elder Construction completed three (3) projects for us this year…relocations of our Pharmacy, Deli, Bakery, Dairy, Meats and Produce, removed existing slabs and installation of new entrance vestibules and drive-thru pharmacy lanes. These stores remained open 24 hours while the renovations were ongoing. Elder performed their work with little, or no more inconvenience than can be expected during these major renovations. Elder was sensitive to the needs of scheduling work, whether working a second shift or working one shift late in the evening when customer traffic was not as busy. Elder worked well with other trades …workmanship was more than acceptable and prices very competitive…Elder was responsive and client-driven.

Ray Dalton, Manager of Facility Engineering, Kroger Mid-South Division

…I have found him to be one of the most professional and efficient businessmen I have dealt with in my extensive profession over the last 26 years…His jobs are always completed on time and the high quality of his company‚Äôs workmanship is exceeded by none. He and his crew are very conscientious about even the most minute details.

Very Rev Fr. D. Alexander Atty, former Pastor of St. Michael The Archangel Antiochian Orthodox Church